94.5% of homes and businesses in Doncaster can get full fibre broadband, above the UK figure of 81%. That's up 7.2 points in a year: 11,638 more premises can now order it. 325 still can't get 10 Mbit/s from a fixed line.
Fastest download speed available, share of all 152,377 premises (homes and businesses), January 2026.
Share of premises that can order full fibre (and gigabit, which also counts cable).
Full fibre Gigabit-capable (incl. cable)
| Doncaster | England | UK | |
|---|---|---|---|
| Full fibre | 94.5% | 81.3% | 81% |
| Gigabit-capable | 96.4% | 88.4% | 87.8% |
| Superfast (30 Mbit/s+) | 99.2% | 97.8% | 97.7% |
| Can't get 10 Mbit/s | 0.2% | 0.6% | 0.7% |
Doncaster ranks 21st of 361 UK council areas for full fibre coverage (see all).
10,321 of 158,202 premises in BDUK's records (6.5%) can't get a gigabit-capable connection yet. Here's what's planned for them.
Contracted build here is due to finish by April 2027.
Average across each district's postcodes. Tap a column to sort.
| DN1 | 88% | 93% | 0% | 392 |
|---|---|---|---|---|
| DN2 | 99% | 100% | 0% | 575 |
| DN3 | 96% | 99% | 0.1% | 714 |
| DN4 | 99% | 100% | 0% | 1309 |
| DN5 | 94% | 99% | 0.1% | 970 |
| DN6 | 93% | 98% | 0.5% | 851 |
| DN11 | 91% | 97% | 1% | 825 |
| DN12 | 95% | 98% | 0.6% | 627 |
94.5% of premises in Doncaster could order full fibre in January 2026, and 96.4% could get gigabit speeds (full fibre or cable). Coverage varies street by street, so check your postcode.
Full fibre coverage in Doncaster went from 87.3% in January 2025 to 94.5% in January 2026: 11,638 more premises.
325 premises in Doncaster (0.2%) can't get 10 Mbit/s download speeds from a fixed line, and 20 can't get what Ofcom calls decent broadband from a fixed line or fixed wireless.
About 54% of premises that can get full fibre in Doncaster have taken it up. The rest are still on older copper or cable lines, often paying similar prices for slower speeds.
10,321 premises in Doncaster can't get gigabit broadband yet. 1,292 are in a provider's own build plans, 595 are in a government Project Gigabit contract due to finish by April 2027, and 8,434 have no plan yet (May 2026). Enter your postcode above to see what's planned where you live.
Of the 8 postcode districts we cover for Doncaster, DN2 has the most gigabit coverage (99% on average) and DN1 the least (88%).
100% of premises in Doncaster have outdoor 5G coverage from at least one mobile network (Ofcom, high-confidence predictions, January 2026). 4G indoors from all four networks reaches 89.2%.